Dual Spindle Technology Solution
A professional CNC lathe manufacturer is always prepared oneself well with solutions for clients !
With permission from clients’, we are sharing you our full experience in bringing productivity processing to our clients .
Please feel free to send your parts drawings and requirements, our team can make processing and automation schemes for you.
Share:
● Process product:Intermediate Sleeve(The exact name is specified by the customer)
● Product material:40Cr(The exact name is specified by the customer)
● Work-piece fixture:
①OP10 Adopting a precision 6-inch hydraulic three jaw chuck (External clip)
②OP20 Adopting a precision 6-inch hydraulic three jaw chuck(bracing)
● Technology note:
①Program to set up the tool life management (After the customer has pre-set the machining quantity, it will automatically give an alarm, reducing the scrap rate of products and the excessive damage of tools).
②Install a pallet to blow water and a gantry loader to blow air.
③Install high-pressure water pump (45 meter head)
● Processing accuracy requirements:
As required by the drawing
1.OP10 Schematic diagram of clamping processing
①Hydraulic Clamping with Internal and External Gripping
②The red area is the machining zone.
| Process OP10 | Tool(T) | processing rotation speed (r/min) | processing feed(mm/r) | processing time (S) | Rapid Tool Change with Fast Movement (S) |
| Turning and chamfering the end face | T1 External turning tool |
1800 | 0.1 | ≈6.5s | ≈1.0s |
| Bore hole | T2 Boring tool |
1800 | 0.07 | ≈18.0s | ≈1.0s |
| OP10 Processing time | ≈26.50s | ||||
| Automated loading and unloading time | ≈ 10.0s | ||||
| Blowing time (cleaning fixture) | ≈2.0s | ||||
| OP10 Total time | ≈36.5s | ||||
| Note: The above calculations are based on theoretical simulations and the material and blank allowance of the product, so there may be a fluctuation of up to 15%. | |||||
2.OP20 Schematic diagram of clamping processing
①Hydraulic Clamping with Internal and External Gripping
②The red area is the machining zone.
| Process OP10 | Tool(T) | processing rotation speed(r/min) | processing feed (mm/r) | Product time (S) | Rapid Tool Change with Fast Movement (S) |
| Face Turning 、Chamfering During OD Turning(coarse) | T1 External Turning Tool | 1800 | 0.12 | ≈13.5s | ≈1.0s |
| Face Turning 、Chamfering During OD Turning(precision) | T2 External Turning Tool | 2200 | 0.09 | ≈16.5s | ≈1.0s |
| Internal Chamfer | T3 Boring tool | 1800 | 0.07 | ≈2.0s | ≈1.0s |
| OP20 Processing time | ≈35.0s | ||||
| Automated loading and unloading time | ≈ 10.0s | ||||
| Blowing time (cleaning fixture) | ≈2.0s | ||||
| OP20 Total time | ≈47.0s | ||||
| Daily production capacity (calculated over 24 hours): 1,838 pieces/ set. | |||||
| Note: The above calculations are based on theoretical simulations and the material and blank allowance of the product, so there may be a fluctuation of up to 15%. | |||||
● The types of equipment recommended for procurement in the plan :SL4620-H3
(1)Machine bed:Precision Linear Guide Rail 45 – degree Double – spindle Double – row Tool Electric Spindle Lathe SL4620
(2) Feeding method:servo gantry robot+disk chain plate+finished product conveyor belt
● Schematic diagram:
(1) Fully Automatic Precision Linear Guideway Double-Spindle Double-Row Tool Electric-Spindle Lathe SL4620-H3 Overall Schematic Diagram:
- 1. Taiwan SYNTEC Bus System
(2)Fully Automatic Precision Linear Guideway Double-Spindle Double-Row Tool Electric-Spindle Lathe SL4620-H3 Overall Schematic Diagram:
(3) Fully Automatic Precision Linear Guideway Double-Spindle Double-Row Tool Electric-Spindle Lathe SL4620-H3 Overall Schematic Diagram:
- 1. Built in crossbeam servo manipulator
- 2. Discharge area finished product conveyor belt
- 3. Storage material system( Disk type chain plate disk type silo)
- 4. Main spindle
- 5. Sub-spindle
- 6. Material sorting device
- 7. Positioning device
(4)Precision Linear Guide Rail 45 – degree Double – spindle Double – row Tool Electric Spindle Lathe SL4620 Machine body schematic :
-
Synchronous electric spindle
1.High rotation speed→ High efficiency
2.Fast acceleration and deceleration→ High efficiency
3.Large torque→ Good rigidity
4.Low vibration→Good surface finish
5.Accurate positioning→Excellent turning and milling perormance - 2. T-shaped row tool holder (power head can be installed additionally)
- 3. Fixture: ① Precision hydraulic three jaw chuck
(5)Schematic diagram of robotic arm hand:
- 1. Rotary Cylinder
- 2. Rotary Cylinder
- 3. Finished product
- 4. Claw Advancing Cylinder
- 5. Cylinder
- 6. Customized Claw Plate Claw Retraction
- 7. Feed Spring Plate
- 8. Customized Claw Plate
- 9. Blank
(6)Schematic Diagram of Disc-Type Chain-Plate Feeder
(7)Schematic diagram of finished product conveyor belt
(8)Dimensional Layout Diagram:
● Technology parameter,configuration list:
1.SL4620 Main technical parameters of machine bed:
| Main parameter items | Unit | Parameter value | |
| Process capacity | Max. Swing diameter | mm | 500 |
| Max.turning diameter | mm | 160 | |
| Max.turning length | mm | 120 | |
| Travel and speed power/torque | X/X1 axis travel | mm | 550 |
| Z/Z1 axis travel | mm | 200 | |
| X /X1axis motor power/torque | Kw/N | 2.4/11.5 | |
| Z/Z1 axis motor power/torque | Kw/N | 2.4/11.5 | |
| Spindle/sub-spindle | Spindle nose | N/A | A2-5 |
| Hydraulic chuck | Inch | 6 | |
| Spindle bore | mm | 56 | |
| Max.diameter of through hole for bar stock | mm | 46 | |
| Spindle power | Kw | 11.7/13.4 | |
| Spindle Max.spindle speed | r/min | 5000 | |
| Spindle rated torque | N | 54/64 | |
| Tool post specification | Cutting tool mode | T-shaped Row Tool Holde | |
| Tool shank size | mm | 20 | |
| Bore seat inner hole | mm | Φ25 | |
| Processing accuracy | X/X1 axis repeatability | mm | 0.003 |
| Z/Z1 axis repeatability | mm | 0.003 | |
| X/Z axis rapid travels | m/min | 20 | |
| Capacity of Oil and Water | Capacity of the Cooling Water Tank | L | ≈200 |
| Hydraulic oil tank capacity | L | ≈60 | |
| Volume of the Machine lathe | Machine full load power | Kw | ≈35 |
| Dimension(L*W*H) | mm | ≈2600*1775*1970 | |
| Total machine weight | Kg | ≈4700 | |
2.SL0636 List of Main Components Configuration of the Machine Tool:
| Number | Name | Brand/Model | Origin | Quantity |
| 1 | CNC system | SYNTEC 22TA bus system(Dual channel) | China Taiwan | 1 |
| 2 | Servo motor/driver | SYNTEC AM11 motor/drive | China Taiwan | 4 |
| 3 | Main motor | 13.4KW synchronous motorized spindle | Italy | 2 |
| 4 | Ball screw/ line guide | PMI | China Taiwan | 4 ,8 |
| 5 | Spindle bearing | NTN P4 | Japan | 10 |
| 6 | Spindle bearing | Front 3 and 2 back independent spindle | GONGTIE | 1 |
| 7 | Screw support mode | Screw support mode | GONGTIE | 1 |
| 8 | Hollow hydraulic | 646 | China | 2 |
| 9 | Hydraulic system | Seven-ocean | China Taiwan | 1 |
| 10 | Heat exchange electric | 5 Number | China | 2 |
| 11 | Low pressure | Schneider | France | 1 |
| 12 | Precision adapter | A2-5 | GONGTIE | 2 |
| 13 | collet | 35 Type | Shanghai | 2 |
| 14 | Pump | Standard formula | China | 1 |
| 15 | Tool post | T-shaped Row Tool Holder | GONGTIE | 10 |
| 16 | Oil cooler | Constant temperature type | China | 1 |
| 2.Optional item: | ||||
| 1 | Fixture | Precision 6-inch 3-jaw hydraulic chuck | China Taiwan | 2 |
| 2 | Chips conveyor | Side mounted type | China | 1 |
3.Automated device : Servo gantry robot
| Number | Component name | Brand model | quantity |
| Core components of the machine | |||
| 1 | Crossbeam Module | GONGTIE | 1 set |
| 2 | Crossbeam Slide Rail | PMI | 1 set |
| 3 | Pneumatic Gripper | Japan SMC | 1 set |
| 4 | Rotary Cylinder | Japan SMC | 1 set |
| 5 | Cylinder | Japan SMC | 1 set |
| 6 | Sensor | Japan SMC | 1 set |
| 7 | Rack and pinion | Henrian(Germany) | 1 set |
| 8 | Storage Feeding System (Disc-Type Chain-Plate Station) | GONGTIE | 1 set |
| 9 | Loading and Unloading Device (Mechanical Claw) | GONGTIE | 1 set |
| 10 | Finished product conveyor belt | GONGTIE | 1 set |
| Core components of the machine | |||
| 1 | Electrical components | Schneider ( France) | 1 set |
| 2 | Servo motor/system | SYNTEC ALL IN ONE | 1 set |
| 3 | control system | SYNTEC ALL IN ONE | 1 set |
| 4 | Reducer | Taiwan | 1 set |
| 5 | Human-Machine Interface | SYNTEC ALL IN ONE | 1 set |
After-Sales Service
- After the equipment is installed in place, debug it in time.
- Reply within 12 hours according to the customer's telephone and email questions.
- During the warranty period (one year), the maintenance caused by non-human shall be borne by our company; After insurance, spare parts and repair are provided with a fee charged.
Contact Gongtie To Get Your Competitive Advantage
- Get A Quote
- Request For Catalog
- Ask For Machine Details
- Get Worry-free Solution
T1 External turning tool
T2 Boring tool
T1 External Turning Tool
T2 External Turning Tool
T3 Boring tool