India One-Drive-Two Articulated Robot Solution
Un fabricant professionnel de tours CNC est toujours prêt à proposer des solutions à ses clients !
Avec l'autorisation de nos clients, nous vous faisons part de notre expérience en matière de traitement de la productivité.
N'hésitez pas à nous envoyer vos dessins de pièces et vos exigences, notre équipe peut élaborer des schémas de traitement et d'automatisation pour vous.
Partager :
India One-Drive-Two Articulated Robot Solution
Process the workpiece
Processing equipment fixture
OP10 Clamp
- 1. Clamping zone
- 2. End face is the machining zone
OP20 Clamp
- 1. Internal expansion clamping zone
- 2. Red outer diameter, end face, and inner bore constitute the machining zone
Op10 Technology
| Operation OP10 | Tool (T) | Spindle Speed (r/min) | Feed Rate (mm/rev) | Machining Time (S) | Rapid Movement & Tool Change (S) |
|---|---|---|---|---|---|
| Face Turning & Chamfering | Outil de tournage extérieur T1 |
2000 | 0.08 | ≈13.0s | ≈2.s |
| Boring & Chamfering | 2000 | 0.12 | ≈8.0s | ≈2.s | |
| Total Time for OP10 | ≈25.0s | ||||
Note: Since no actual trial machining has been performed, the system-simulated time may fluctuate by ±15% compared with the actual machining time.
| Operation OP20 | Tool (T) | Spindle Speed (r/min) | Feed Rate (mm/rev) | Machining Time (S) | Rapid Movement & Tool Change (S) |
|---|---|---|---|---|---|
| Rough OD Turning & Chamfering | T1 Rough OD Turning Tool |
1800 | 0.12 | ≈8.0s | ≈2.s |
| Finish OD Turning & Chamfering | T2 Finish OD Turning Tool |
2000 | 0.08 | ≈8.0s | ≈2.s |
| Boring & Chamfering | 2000 | 0.12 | ≈3.0s | ≈2.s | |
| Total Time for OP20 | ≈25s | ||||
Note: Since no actual trial machining has been performed, the system-simulated time may fluctuate by ±15% compared with the actual machining time.
Workpiece Process Cycle Time
| Product | Operation (No.) | Machine/Type | Machine Qty | Single Machine Machining Time (s) | Auto Loading/Unloading Time (s) | Auto Door Cycle Time (s) | Unit Takt Time (s) |
|---|---|---|---|---|---|---|---|
| Specified | OP10 | X3630E | 1 | 25 | 12 (incl. 3s air blow) | 4 | 41 |
| Specified | OP20 | X3630E | 1 | 25 | 12 (incl. 3s air blow) | 4 | 41 |
Note: All figures above are theoretical calculated data; actual machining may have a tolerance of ±15%.
Production Capacity Calculation
Capacity Calculation Details
Machining Takt of Current Process
Operation OP10 and OP20 share identical machining cycle time of 25 seconds, so the machining takt is 25s per workpiece.
Auxiliary Time
Automatic loading & unloading takt: 12s per machine (including 3s air blow cleaning).
Full Line Takt Time
Machining time (25s) + Automatic loading/unloading time (12s) + Auto door opening & closing time (4s) = Total line takt of 41s per workpiece.
Equipment Availability Rate: 85%
Working schedule: 12 months per year, 22 working days per month, 2 shifts per day, 8 working hours per shift.
Output per Shift
8 × 60 × 60 × 0.85 ÷ 41 ≈ 597 pcs
Daily Output
597 × 2 = 1194 pcs
Monthly Output
1194 × 22 = 26268 pcs
Annual Output
12 × 26268 ≈ 315,000 pcs
The above capacity is a theoretical value calculated based on the current machining process, which may differ from actual production output.
The throughput of this automatic line can be improved by tool replacement and cutting parameter optimization.
Machine Infomation
Gong Tie X3630E Machine
Machine Parameter
| Parameter Description | Unité | X3630E | |
|---|---|---|---|
| Machining Range | Max. Swing Diameter | mm | 420 |
| Diamètre de tournage max. Diamètre de tournage | mm | 100 | |
| Max. Longueur de tournage | mm | 120 | |
| Movement Range | Max. X-Axis Travel | mm | 700 |
| Max. Z-Axis Travel | mm | 300 | |
| Max. Y-Axis Travel | mm | – | |
| Main Spindle | Spindle Nose / Spindle Cone | N/A | A2-5 |
| Collect Size | mm | 640 Collect | |
| Alésage de la broche | mm | 48 | |
| Spindle Cylinder Bore | mm | 35 | |
| Gamme de vitesse de la broche | tr/min | 3500 | |
| Max. Spindle Torque | N.m | 36 | |
| Puissance de la broche | Kw | 5.5 | |
| X/Z Axis Motor Power / Torque | Kw/N.m | AM8/1.7KW | |
| Live Tool Power / Torque | Kw/N.m | – | |
| Accuracy | Min. Setting Unit | mm | 0.001 |
| X/Z-Axis Rapid Traverse | m/min | 20/20 | |
| X/Z-Axis Positioning Repeatability | mm | 0.003 | |
| Contre-pointe | Max. Course du fourreau de la contre-pointe | mm | – |
| Max. Course de la contre-pointe | mm | – | |
| Tailstock Tapper | mm | – | |
| Tool Changing | Gang Tool Holders | Non. | 5 |
| Taille de la queue de l'outil | mm | 16 | |
| Porte-outil d'alésage | mm | Φ20 | |
| Machine Construction | Machine Full Load Power | Kw | ≈16kw |
| Overall Dimension LWH | mm | ≈18014501610 | |
| Machine Total Weight | Kg | ≈2200 | |
Standard Accessories
| Non. | Nom | Marque/Modèle | Origine | Qté |
|---|---|---|---|---|
| 1 | Système CNC | New Generation 7TA Bus System | Taïwan, Chine | 1 |
| 2 | Servo Motor/Driver | New Generation AM5 Bus Motor | Taïwan, Chine | 1 |
| 3 | Spindle Motor | New Generation 5.5KW Servo Spindle Motor | Taïwan, Chine | 1 |
| 4 | Vis à billes | PMI (Yintai) | Taïwan, Chine | 2 |
| 5 | Linear Guideway | PMI (Yintai) | Taïwan, Chine | 4 |
| 6 | Spindle Bearing | NSK (P4) | Japon | 5 |
| 7 | Spindle Structure | 3 Front & 2 Rear Independent Spindle Unit | GONGTIE R&D | 1 |
| 8 | Ball Screw Support Method | Pre-stretched Dual Support | GONGTIE R&D | 1 |
| 9 | Hollow Hydraulic Rotary Cylinder | TK536 | Chine | 1 |
| 10 | Système hydraulique | Yousheng or Xingyuan | Chine | 1 |
| 11 | Air-cooled Heat Exchanger & Cabinet | N° 5 | Chine | 1 |
| 12 | Low-voltage Electrical Apparatus | Delixi | Chine | 1 |
| 13 | Fixation | 3-jaw Chuck | Domestic (China) | 1 |
| 14 | Water Pump | Ruijia (2M Head) | Chine | 1 |
| 15 | Tool Holder | GONGTIE R&D | 5 | |
| 16 | Machine Foot | GONGTIE R&D | 4 |
Optional Accessories
| Non. | Nom | Non. | Nom |
|---|---|---|---|
| 1 | Chip Conveyor (Rear-mounted) | 9 | Asynchronous Electric Spindle |
| 2 | Oil Contaminant Collector (Water/Oil) | 10 | Automatic Door |
| 3 | Servo Turret (63-8/50-8T) | 11 | Bar Feeder Interface |
| 4 | Part Catcher | 12 | High-pressure Pump |
| 5 | Turning & Milling Power Head (6T) | 13 | Spindle Rear Flushing (with M-code) |
| 6 | Face/Side Milling Power Head | 14 | Special Fixture |
| 7 | Chuck (6-inch) | 15 | Alimentateur de barres |
| 8 | CNC System: KND/GSK/FANUC | 16 | Enlarged Spindle (46 Mechanical + 7.5KW Spindle Motor) |
Note: The above optional accessories are not part of the agreement. Whether to select them will be specified in the sales contract.
Articulated Robot Layout
- 1.OP10 Machine
- 2. Safety Guarding
- 3. Inspection Station
- 4. Air Blow Cleaning Bin
- 5. OP20 Machine
- 6. Articulated Robot
- 7. NG Discharge Outlet
- 8. NG Discharge Outlet
- 9. Turning Station
- 10. Articulated Robot Base Mount
Note: This automation unit consists of 1 set of XINDAI LA1442-12 articulated robot unit, 1 set of double-layer material stock bin, 1 set of gripper unit, 1 set of inspection station, 1 set of air blow cleaning bin, 1 set of turning station and 1 robot base mount. It cooperates with two Gongtie X3630E CNC lathes to realize fully automatic machining of workpieces.
Joint robot layout dimensions
Robot Motion Description
Collaborative Robot Motion Procedure
- Operators place raw workpieces on the double-layer stock bin.
- Press the start button to activate the automatic production line.
- The stock tray conveys workpieces to the robot picking station.
- The articulated robot picks raw workpieces from the stock bin.
- The articulated robot moves to Machine No.1 to unload finished parts and load new blanks.
- The articulated robot transfers the workpiece to the turning station to flip its orientation.
- The articulated robot moves to Machine No.2 for blank loading and finished part unloading.
- Based on the fixed batch machining parameter set in the automation system, after several machining cycles, the robot transfers finished workpieces to the air blow cleaning bin for chip removal. Afterwards, it moves to the inspection station to measure surface dimensions of each workpiece: qualified workpieces are placed back onto the double-layer tray, while defective pieces are dropped into the NG collection bin.
- The above cycle repeats continuously until all workpieces in the stock bin finish machining, then the system alerts operators to unload completed parts.
| Non. | Item Name | Unité | Qté | Remarques |
|---|---|---|---|---|
| 1 | LA1442-12 Articulated Robot | Set (jeu de mots) | 1 | SYNTEC articulated robot with 12Kg payload |
| 2 | 2-Station Gripper System | Set (jeu de mots) | 1 | For machine tool loading/unloading and workpiece orientation flipping |
| 3 | Double-Layer Stock Bin | Set (jeu de mots) | 1 | For storing raw blanks and finished workpieces |
| 4 | Inspection Station | Set (jeu de mots) | 1 | For workpiece dimension measurement |
| 5 | Turning Station | Set (jeu de mots) | 1 | For workpiece reorientation / flipping |
| 6 | Air Blow Cleaning Bin | Set (jeu de mots) | 1 | For surface chip cleaning of workpieces |
| 7 | Robot Base Mount | Set (jeu de mots) | 1 | Fixed support base for robot installation |
| 8 | Safety Guard System | Set (jeu de mots) | 1 | Enclosure for robot working area, equipped with safety door interlock, etc. |
| 9 | Pneumatic Unit | Set (jeu de mots) | 1 | Air source processor, pneumatic components and accessories |
| 10 | Electrical Integration Package | Set (jeu de mots) | 1 | Solenoid valve manifold, gripper motion control circuit, etc. |
| 11 | Attached Operation Manuals | Set (jeu de mots) | 1 | Electrical & mechanical maintenance service manuals |
Description of key functional components
- SYNTEC LA1442-12 Articulated Robot
Description of key functional components
| Model | LA1442-12 | |
| Controlled Axes | 6 | |
| Max. Payload Capacity (kg) | 12 | |
| Reach (mm) | 1442 | |
| Repeat Positioning Accuracy (mm) | ±0.03 | |
| Joint Range | J1 Axis (°) | ±170 |
| J2 Axis (°) | +145/-105 | |
| J3 Axis (°) | +70/-210 | |
| J4 Axis (°) | ±270 | |
| J5 Axis (°) | ±135 | |
| J6 Axis (°) | ±360 | |
| Max. Speed | J1 Axis (°/s) | 245 |
| J2 Axis (°/s) | 245 | |
| J3 Axis (°/s) | 290 | |
| J4 Axis (°/s) | 435 | |
| J5 Axis (°/s) | 450 | |
| J6 Axis (°/s) | 705 | |
| Motor Power | J1 Axis (kW) | 1.5 |
| J2 Axis (kW) | 1.5 | |
| J3 Axis (kW) | 0.75 | |
| J4 Axis (kW) | 0.2 | |
| J5 Axis (kW) | 0.2 | |
| J6 Axis (kW) | 0.2 | |
| Weight (kg) | ≈115 | |
| Mounting Type | Floor, Ceiling, Inclined | |
| Protection Class | IP67 | |
| Operating Conditions | Ambient Temperature:0 ~ 45°C | |
| Ambient Humidity: 20~80%RH (no condensation), max 90%RH for ≤1 month | ||
| Vibration Acceleration:≤4.9m/s² (0.5G) | ||
2. Articulated Robot Base Mount
Description: The base mount of the articulated robot is mainly used for robot fixing. Besides, its height design enables the robot’s maximum reach to fully cover the loading and unloading space of the machine tools.
3. Articulated Gripper Unit
Gripper schematic
According to the machine tool loading requirements, a 2-station gripper is adopted. The gripper is equipped with two sets of standard 3-jaw pneumatic fingers to clamp workpieces, meeting the demands of workpiece picking and internal workpiece exchange inside the machine tool.
The gripper is fitted with sensors for workpiece presence detection and jaw open/closed state detection. It features a function to prevent workpieces from falling in case of air cut-off or power failure.
Subject to detailed design drawings.
4. Double-LayerPneumaticInterchangeableMovingPallet
Gripper schematic
Description: In accordance with workpiece characteristic requirements, double-layer stacking pallets are adopted. The pallets are driven by air cylinders for horizontal in-and-out movement. Each pallet can hold 50 workpieces, with 4 pallets in total, delivering a total storage capacity of 200 parts. Note: The tooling pallets can be directly replaced when switching production batches.
5. Inspection Station
- 1.Outer diameter inspection
- 2. Servo-driven vertical sliding stage
- 3. Length inspection
- 4. Pneumatic sliding stage
Description
Inspection of the workpiece is realized by the movement of servo electric cylinder to complete measurement at different positions:
- Item 1, 2, 3, 4, 5 and 7: Dimension inspection via contact sensors;
- Item 6: Inner bore dimensional precision inspection by air tightness test.
If the dimensional inspection result is qualified, the workpiece will be placed back to the material pallet. If the workpiece dimension fails the inspection, the manipulator will transfer the workpiece into the NG collection bin.
6. Air Blow Cleaning Bin
Description
The air blow cleaning bin is mainly used to remove metal chips on workpiece surfaces, so as to guarantee the measurement accuracy during workpiece inspection on the inspection station.
Note
The detailed structure shall be subject to the final design.
7. Turning Station
According to the workpiece machining process requirements, the design of the turning station for this project is shown in the figure on the right. It is mainly composed of a fixed base and clamping gripper.
By adjusting the robot posture, the workpiece is rotated 180 degrees to meet the posture requirement for machining in the next process.
8. Safety Guard System
To ensure personnel safety, safety guarding is installed around the robot, which is equipped with safety doors fitted with door interlock switches.
The door interlock switches are interlocked with the robot control system. When the safety door is opened, the robot will stop automatically to protect operators.
The actual guard height shall comply with customer requirements.
Service après-vente
- Une fois l'équipement installé, il faut le déboguer à temps.
- Répondre dans les 12 heures aux questions posées par téléphone ou par courrier électronique.
- Pendant la période de garantie (un an), l'entretien causé par des personnes non humaines est pris en charge par notre société ; après l'assurance, les pièces de rechange et les réparations sont fournies moyennant une redevance.
Contactez Gongtie pour obtenir un avantage concurrentiel
- Obtenir un devis
- Demande de catalogue
- Demander les détails de la machine
- Obtenir une solution sans souci
Outil de tournage extérieur T1