GT-MJ0830 Technical Agreement Technical Solution (Spray Parts)
A professional CNC lathe manufacturer is always prepared oneself well with solutions for clients !
With permission from clients’, we are sharing you our full experience in bringing productivity processing to our clients .
Please feel free to send your parts drawings and requirements, our team can make processing and automation schemes for you.
Share:
- Product processing plan
1、Customer:(The accurate name is specified by the customer)
2、Processed products:Spray Parts(The accurate name is specified by the customer)
3、Product material:copper(The accurate name is specified by the customer)
4、Product schematic diagram:
5、Fixtures: OP10/OP20 both use precision 8-inch hydraulic indexing chucks
6、 technical memo :①Technology note :Program to set up the tool life management (After the customer has pre-set the machining quantity, it will automatically give an alarm, reducing the scrap rate of products and the excessive damage of tools).
② Install a chip conveyor
③ Tool Holder with Added Through-Spindle Coolant Function
④ 45M 45 lifting water pump
7、Processing accuracy requirements: strictly follow the drawing requirements:
(Finished product graphics)
Schematic diagram of workpiece OP10 machining clamping
① External hydraulic clamping method ② Green area is the processing area
Processing | Tool | Processing rotation speed | Processing feed mm/t | Processing time(S) | Switch |
Face Turning、Coarse turning of outside diameter |
| 2350 | 0.2 | ≈11.5s | ≈1.5s |
Combined Drilling |
| 2000 | 0.1 | ≈6.5s | ≈1.5s |
External cylindrical turning (precise) |
| 3000 | 0.1 | ≈5.0s | ≈1.5s |
External Thread Turning(outside) |
| 600 | 1.814 | ≈9.0s | ≈1.5s |
Boring hole(PCD) |
| 2200 | 0.08 | ≈6.5s | ≈1.5s |
Internal Thread Turning |
| 900 | 1.0 | ≈5.0s | ≈1.5s |
Boring hole(PCD) |
| 2200 | 0.08 | ≈2.0s | ≈1.5s |
Internal Thread Turning |
| 900 | 1.0 | ≈1.5s | ≈1.5s |
OP10 Processing time(S) | ≈59.0s | ||||
Feeding time(S) | ≈10.0s | ||||
Blowing time(S) | ≈3.0s | ||||
OP10 Total time(S) | ≈72.0s | ||||
Note: Due to the lack of rough samples for actual testing, the theoretical simulation calculation time may fluctuate by up to 15% | |||||
Work-piece OP20 Schematic diagram of clamping processing
①external clamping hydraulic clamping mode ②The red area is the processing area
processing | Tool | Processing rotation speed | Processing feed mm/t | Processing time(S) | Switch |
External cylindrical turning (precise) |
| 2600 | 0.05 | ≈6.0s | ≈1.5s |
Spot Drilling |
| 3000 | 0.04 | ≈2.0s | ≈1.5s |
Spot Drilling |
| 3000 | 0.05 | ≈6.0s | ≈1.5s |
boring(PCD) |
| 2200 | 0.04 | ≈8.0s | ≈1.5s |
OP20 Processing time(S) | ≈28.0s | ||||
Turnaround switching time(S) | ≈3.0s | ||||
Unloading time(S) | ≈10.0s | ||||
OP20Total time(S) | ≈41.0s | ||||
Note: Due to the lack of blank samples for actual testing, the theoretical simulation calculation time may fluctuate by up to 15% | |||||
8、Equipment type for scheme procurement:MJ0830
(1)Lathe:Precision Linear Guideway Slant-Bed Turret Lathe with Spindle: MJ0830
(2)Feeding Method: Stacking Servo Gantry loader + Double-Layer Tray stocking Device
9、Diagrammatic sketch:
(1)Precision Linear Guideway Slant-Bed Turret Lathe with Spindle: MJ0830 overall Schematic Diagram
(2)Machine body schematic diagram:
- 1. Hydraulic rotary cylinder
- 2. Synchronous electric spindle 1.High rotation speed→ High efficiency 2.Fast acceleration and deceleration→ High efficiency 3.Large torque→ Good rigidity 4.Low vibration→Good surface finish 5.Accurate positioning→Excellent turning and milling perormance
- 3. Precision 6-inch hydraulic chuck
- 4. 12 stations servo turret
- 5.Oil cooler
- 6. Hydraulic station
- 7. Machine body and integral casting (greatly enhancing the rigidity of the machine tool)
(3)Layout dimension diagram:
Note: The final dimensions are subject to the design drawings
Action Description of Gantry Loader:
1.Manually place incoming materials on the double-layer storage bin;
2.Press the start button, and the automatic line starts running;
3.The gantry robot moves to the double-layer pallet to grab materials;
4.The gantry robot moves to the machine tool, and the machine tool’s automatic door opens;
5.The gantry robot unloads and loads materials inside the machine tool;
6.The gantry robot exits the machine tool, the automatic door closes, and the machine tool starts processing;
7.The gantry robot moves to the double-layer storage bin to grab and unload materials;
8.The gantry robot moves to the machine tool, and the machine tool’s automatic door opens;
9.The above cycle repeats…
NO. | Component name | Brand/model | Quantity |
Mechanical core components |
| ||
1 | Gantry Loader Body | GONGTIE | 1set |
2 | protection | GONGTIE | 1set |
3 | grippers | Japan SMC | 1set |
4 | Gears, racks | Carroll/Sote | 1set |
5 | Track, slider | Japan SMC | 1set |
6 | Sensor | AirTAC/CSK | 1set |
7 | Drag chain | Koris | 1set |
8 | lubrication | Ishan | 1set |
9 | System | Syntec | 1set |
10 | Servo motor/drive | Syntec ALL IN ONE | 1set |
3 | Reducer | Xinbao/Liming | 1set |
4 | Pneumatic components | SMC | 1set |
5 | Main electrical components | Schneider, Weidmuller, Siemens, Izumi, | 1set |
(5)Gantry loader technology parameter
No. | Item | Unit | Parameter | Note | |
1 | Gantry loader Lifting Capacity | Kg | 0.5 | Grasp the max. weight of the workpiece | |
2 | Horizontal axis (X-axis) | speed | m/min | 120 | – |
3 | acceleration | M/s2 | 5 | – | |
4 | Vertical axis (Z-axis) | speed | m/min | 100 | – |
5 | acceleration | M/s2 | 4 | – | |
6 | Drive Type | – | Servo+reducer | – | |
7 | Position repeatability | mm | ≤±0.1 | – | |
8 | Control method | – | Syntec | – | |
9 | Other | Power supply voltage range | V | 380±10% 50Hz | – |
Gas source pressure range | Map | 0.4~0.6 | – | ||
(6)Schematic diagram of the robotic arm: (as shown in Figure 1 on the right)
- 1. According to the machining process requirements of the workpiece, the gantry loader in this project adopts a double-station orthogonal 90-degree swing gripper system, using standard pneumatic grippers to clamp parts, which meets the requirements of grabbing parts and changing materials inside the machine tool. The gripper is equipped with sensors for detecting the presence of workpieces and sensors for detecting the clamping and releasing status of the gripper. The gripper has the function of preventing workpieces from falling in case of air and power failure. The structural diagram of the robot gripper is as follows (whether the gripper is internally supporting or externally clamping shall be subject to the countersigned drawings).
(7)Storage method: double-layer tray stocking (as shown in Figure 2 on the right)
- The double-layer tray stocking adopts dual-drive and independent control, enabling pallet exchange for loading and unloading to ensure non-stop operation of the gantry loader. The tooling pallet and the main structure are designed as a separated structure for easy product changeover and loading/unloading. There are 4 pallets in total for the upper and lower layers, with each pallet measuring 250*500mm. Each pallet can store up to 40 workpieces, and the total storage capacity of the 4 pallets is 160 workpieces. The tooling pallet can be customized according to the customer's products, and this structure facilitates continued use when the customer replaces parts in the later stage (Note: The gripper also needs to be modified according to the external structure of the product).
①Schematic diagram of feeding tray stocking
②Schematic diagram of unloading tray stocking
Technology parameter,configuration list:
1.MJ0830 Main technical parameters of machine bed:
Main parameter items | Unit | Value | |
Process capacity | Max. Swing diameter | mm | 600 |
Max.turning diameter | mm | 320 | |
Max.turning length | mm | 300 | |
Travel and speed power/torque | X axis travel | mm | 185 |
Z axis travel | mm | 350 | |
Tail-stock travel | mm | 270 | |
Tail-stock quill travel | mm | 100 | |
X axis motor power/torque | Kw/N | 2.4/11.5 | |
Z axis motor power/torque | Kw/N | 2.4/11.5 | |
Spindle | Spindle nose | N/A | A2-5 |
Hydraulic chuck | inch | 6 | |
Spindle bore | mm | 56 | |
Max.diameter of through hole for bar stock | mm | <46 | |
Spindle power | Kw | 11.7/13.4 | |
Spindle Max.spindle speed | r/min | 5000 | |
Spindle rated torque | N | 56/64 | |
Tool post specification | Tool holder form | Servo turret | |
Tool shank size | mm | 20 | |
Bore seat inner hole | mm | Φ32 | |
Turret method center height | cm | H100 | |
Turret stations | Station | 12T | |
Processing accuracy | X axis repeatability | mm | 0.003 |
Z axis repeatability | mm | 0.003 | |
X/Z axis rapid travels | m/min | 20 | |
Capacity of Oil and Water | Capacity of the Cooling Water Tank | L | ≈105 |
Hydraulic oil tank capacity | L | ≈40 | |
Machine volume | Machine full load power | Kw | ≈23 |
Dimension(L*W*H) | mm | ≈1985*1668*1760 | |
Total machine weight | Kg | ≈2800 | |
2.MJ0830 List of Main Components Configuration of the Machine Tool:
NO. | Name | Brand/model | Origin | Quantity |
1 | CNC system | SYNTEC 22TA bus system | China Taiwan | 1 |
2 | Servo motor/driver | SYNTEC Multi in one SMH series | China Taiwan | 2 |
3 | Main motor | 11.7KW synchronous motorized spindle | Italy | 1 |
4 | Ball screw | PMI | China Taiwan | 2 |
5 | linear guide | PMI | China Taiwan | 4 |
6 | Spindle bearing | NTN(P4) | Japan | 5 |
7 | Spindle structure | Front 3 and 2 back independent spindle | GONGTIE | 1 |
8 | Screw support mode | Pre stretched double support | GONGTIE | 1 |
9 | Hollow hydraulic | 646 | China | 1 |
10 | Hydraulic system | Seven ocean SHF series | China Taiwan | 1 |
11 | Heat exchange electric | 5 | China | 1 |
12 | Low pressure | Schneider | France | 1 |
13 | Clamp | Precision 6-inch hydraulic three jaw chuck | China Taiwan | 1 |
14 | Turret | 12 stations servo turret | GONGTIE | 1 |
15 | Pump | High pressure water pump with a lift of 15 M | China | |
16 | Hydraulic tailstock | Built in hydraulic tailstock+MT4 ejector pin (Taiwan) | GONGTIE | 1 |
17 | Turret and tool holder | Boring tool holder+positive tool holder | Origin of the turret manufacturer | 8 |
18 | Oil cooler | Constant temperature type | China | 1 |
2.Additional projects: | ||||
1 | Chip conveyor | Rear-mounted | China | 1 |
2 | Pump | 45M lifting | China | 1 |
3 | Chuck | Dividing chuck (including hydraulic valve) | China | 1 |
After-Sales Service
- 1.Debug the equipment in a timely manner after it is installed in place.
- 2.Provide a reply within 1 hour for the problems reported by the customer via telephone or fax.
- 3.Provide on-site service and maintenance. Arrive at the site within 24 hours in the urban area, within 48 hours within the province (including Jiangsu, Zhejiang and Shanghai), and for other regions, it will be determined according to the specific situation.
- 4.During the warranty period (one year), for repairs not caused by human factors, our company will bear the cost. After the warranty period expires, we will provide accessories and maintenance services on a paid basis.
Randomly delivery project
Delivery project | Quantity |
Instruction Manual | 1set |
Machine Tool Warranty Card | 1set |
Electrical instruction manual | 1set |
Machine Tool Inspection Report | 1set |
Numerical Control System Manual | 1set |
Common Tools | 1set |
T1External Turning Tool
T3 Boring Tool
T4 Threading Tool
T6 Threading Tool
T1Boring hole