GT-MJ0830 Technical Agreement Technical Solution (Spray Parts)

A professional CNC lathe manufacturer is always prepared oneself well with solutions for clients !

With permission from clients’, we are sharing you our full experience in bringing productivity processing to our clients .
Please feel free to send your parts drawings and requirements, our team can make processing and automation schemes for you.

Share:

GT-MJ0830

Product diagram
  • Product processing plan

1、Customer:(The accurate name is specified by the customer)

2、Processed products:Spray Parts(The accurate name is specified by the customer)

3、Product material:copper(The accurate name is specified by the customer)

4、Product schematic diagram:

5、Fixtures: OP10/OP20 both use precision 8-inch hydraulic indexing chucks  

6、 technical memo :①Technology note :Program to set up the tool life management (After the customer has pre-set the machining quantity, it will automatically give an alarm, reducing the scrap rate of products and the excessive damage of tools).

② Install a chip conveyor

③ Tool Holder with Added Through-Spindle Coolant Function

④ 45M 45 lifting water pump

7、Processing accuracy requirements: strictly follow the drawing requirements:

(Finished product graphics)

Schematic diagram of workpiece OP10 machining clamping

T1/T2/T3
T4/T5/T6

① External hydraulic clamping method     ② Green area is the processing area

Processing

Tool

Processing rotation speed

Processing feed mm/t

Processing time(S)

Switch

Face Turning、Coarse turning of outside diameter

T1External Turning Tool

2350

0.2

≈11.5s

≈1.5s

Combined Drilling

T2 Step Drill

2000

0.1

≈6.5s

≈1.5s

External cylindrical turning (precise)

T3 Boring Tool

3000

0.1

≈5.0s

≈1.5s

External Thread Turning(outside)

T4 Threading Tool

600

1.814

≈9.0s

≈1.5s

Boring hole(PCD)

T5 Internal Grooving Tool

2200

0.08

≈6.5s

≈1.5s

Internal Thread Turning

T6 Threading Tool

900

1.0

≈5.0s

≈1.5s

Boring hole(PCD)

T5 Internal Grooving Tool

2200

0.08

≈2.0s

≈1.5s

Internal Thread Turning

T6 Threading Tool

900

1.0

≈1.5s

≈1.5s

OP10 Processing time(S)

≈59.0s

Feeding time(S)

≈10.0s

Blowing time(S)

≈3.0s

OP10 Total time(S)

≈72.0s

Note: Due to the lack of rough samples for actual testing, the theoretical simulation calculation time may fluctuate by up to 15%

Work-piece OP20 Schematic diagram of clamping processing

T2/T3/T4
T1

 ①external clamping hydraulic clamping mode ②The red area is the processing area

processing

Tool

Processing rotation speed

Processing feed mm/t

Processing time(S)

Switch

External cylindrical turning (precise)

T1Boring hole

2600

0.05

≈6.0s

≈1.5s

Spot Drilling

T2 Spot Drill

3000

0.04

≈2.0s

≈1.5s

Spot Drilling

T3 Spot Drill

3000

0.05

≈6.0s

≈1.5s

boring(PCD)

T4 Internal Grooving Tool

2200

0.04

≈8.0s

≈1.5s

OP20 Processing time(S)

≈28.0s

Turnaround switching time(S)

≈3.0s

Unloading time(S)

≈10.0s

OP20Total time(S)

≈41.0s

Note: Due to the lack of blank samples for actual testing, the theoretical simulation calculation time may fluctuate by up to 15%

8、Equipment type for scheme procurement:MJ0830

(1)Lathe:Precision Linear Guideway Slant-Bed Turret Lathe with Spindle: MJ0830

(2)Feeding Method: Stacking Servo Gantry loader + Double-Layer Tray stocking Device

9、Diagrammatic sketch:

(1)Precision Linear Guideway Slant-Bed Turret Lathe with Spindle: MJ0830 overall Schematic Diagram

 

(2)Machine body schematic diagram:

1
2
3
4
5
6
7

(3)Layout dimension diagram:

Note: The final dimensions are subject to the design drawings

Action Description of Gantry Loader:

1.Manually place incoming materials on the double-layer storage bin;

2.Press the start button, and the automatic line starts running;

3.The gantry robot moves to the double-layer pallet to grab materials;

4.The gantry robot moves to the machine tool, and the machine tool’s automatic door opens;

5.The gantry robot unloads and loads materials inside the machine tool;

6.The gantry robot exits the machine tool, the automatic door closes, and the machine tool starts processing;

7.The gantry robot moves to the double-layer storage bin to grab and unload materials;

8.The gantry robot moves to the machine tool, and the machine tool’s automatic door opens;

9.The above cycle repeats…

NO.

Component name

Brand/model

Quantity

           Mechanical core components

 

1

Gantry Loader Body

GONGTIE

1set

2

protection

GONGTIE

1set

3

grippers

Japan SMC

1set

4

Gears, racks

Carroll/Sote

1set

5

Track, slider

Japan SMC

1set

6

Sensor

AirTAC/CSK

1set

7

Drag chain

Koris

1set

8

lubrication

Ishan

1set

9

System

Syntec

1set

10

Servo motor/drive

Syntec ALL IN ONE

1set

3

Reducer

Xinbao/Liming

1set

4

Pneumatic components

SMC

1set

5

Main electrical components

Schneider, Weidmuller, Siemens, Izumi,

1set

(5)Gantry loader technology parameter

No.

Item

Unit

Parameter

Note

1

Gantry loader Lifting Capacity

Kg

0.5

Grasp the max. weight of the workpiece

2

Horizontal axis (X-axis)

speed

m/min

120

–

3

acceleration

M/s2

5

–

4

Vertical axis (Z-axis)

speed

m/min

100

–

5

acceleration

M/s2

4

–

6

Drive Type

–

Servo+reducer

–

7

Position repeatability

mm

≤±0.1

–

8

Control method

–

Syntec

–

9

Other

Power supply voltage range

V

380±10%  50Hz

–

Gas source pressure range

Map

0.4~0.6

–

(6)Schematic diagram of the robotic arm: (as shown in Figure 1 on the right)

Claw Diagram (1)

(7)Storage method: double-layer tray stocking (as shown in Figure 2 on the right)

Diagram of tray stocking(2)

①Schematic diagram of feeding tray stocking

②Schematic diagram of unloading tray stocking

Technology parameter,configuration list:

1.MJ0830 Main technical parameters of machine bed:

Main parameter items

Unit

Value

Process capacity

Max. Swing diameter

mm

600

Max.turning diameter

mm

320

Max.turning length

mm

300

Travel and speed power/torque

X axis travel

mm

185

Z axis travel

mm

350

Tail-stock travel

mm

270

Tail-stock quill travel

mm

100

X axis motor power/torque

Kw/N

2.4/11.5

Z axis motor power/torque

Kw/N

2.4/11.5

Spindle

Spindle nose

N/A

A2-5

Hydraulic chuck

inch

6

Spindle bore

mm

56

Max.diameter of through hole for bar stock

mm

<46

Spindle power

Kw

11.7/13.4

Spindle Max.spindle speed

r/min

5000

Spindle rated torque

N

56/64

Tool post specification

Tool holder form

 

Servo turret

Tool shank size

mm

20

Bore seat inner hole

mm

Φ32

Turret method center height

cm

H100

Turret stations

Station

12T

Processing accuracy

X axis repeatability

mm

0.003

Z axis repeatability

mm

0.003

X/Z axis rapid travels

m/min

20

Capacity of Oil and Water

Capacity of the Cooling Water Tank

L

≈105

Hydraulic oil tank capacity

L

≈40

Machine volume

Machine full load power

Kw

≈23

Dimension(L*W*H)

mm

≈1985*1668*1760

Total machine weight

Kg

≈2800

2.MJ0830 List of Main Components Configuration of the Machine Tool:

NO.

Name

Brand/model

Origin

Quantity

1

CNC system

 SYNTEC 22TA bus system

China Taiwan

1

2

Servo motor/driver

SYNTEC Multi in one SMH series

China Taiwan

2

3

Main motor

11.7KW synchronous motorized spindle

Italy

1

4

Ball screw

PMI

China Taiwan

2

5

linear guide

PMI

China Taiwan

4

6

Spindle bearing

NTN(P4) 

Japan

5

7

Spindle structure

Front 3 and 2 back independent spindle

GONGTIE

1

8

Screw support mode

Pre stretched double support

GONGTIE

1

9

Hollow hydraulic

646

China

1

10

Hydraulic system

Seven ocean SHF series

China Taiwan

1

11

Heat exchange electric

5

China

1

12

Low pressure

Schneider

France

1

13

Clamp

Precision 6-inch hydraulic three jaw chuck

China Taiwan

1

14

Turret

12 stations servo turret

GONGTIE

1

15

Pump

High pressure water pump with a lift of 15 M

China

 

16

Hydraulic tailstock

Built in hydraulic tailstock+MT4 ejector pin (Taiwan)

GONGTIE

1

17

Turret and tool holder

Boring tool holder+positive tool holder

Origin of the turret manufacturer

8

18

Oil cooler

Constant temperature type

China

1

2.Additional projects:

1

Chip conveyor

Rear-mounted

 China

1

2

Pump

45M lifting

China

1

3

Chuck

Dividing chuck (including hydraulic valve)

China

1

After-Sales Service

Randomly delivery project

Delivery project

Quantity

Instruction Manual

1set

Machine Tool Warranty Card

1set

Electrical instruction manual

1set

Machine Tool Inspection Report

1set

Numerical Control System Manual

1set

Common Tools

1set