MDY0850-S Automation Solution
A professional CNC lathe manufacturer is always prepared oneself well with solutions for clients !
With permission from clients’, we are sharing you our full experience in bringing productivity processing to our clients .
Please feel free to send your parts drawings and requirements, our team can make processing and automation schemes for you.
Share:
- OP10 Machining clamping diagram
① External clamping hydraulic clamping method
② The red area is the processing area
| Process OP10 | Cutter(T) | Processing speed(r/min) | Processing feed(mm/r) | Processing Time (S) | Quick moving knife (S) |
| End face, chamfer Outside diameter (thick) |
T1 Cylindrical cutter |
2400 | 0.15 | ≈9.5s | ≈1.5s |
| Drilling (15U drill) | ![]() T2 U drill |
1500 | 0.12 | ≈11.5s | ≈1.5s |
| Radial point hole | ![]() T3 center drill |
2500 | 0.08 | ≈4.0s | ≈4.0s |
| Punching(¢2.0) | ![]() T4 drill bit |
2500 | 0.06 | ≈8.0s | ≈4.0s |
| Spline milling (thick)(¢1.8) | ![]() T5 Alloy end mill |
2200 | 0.15 | ≈20.0s | ≈5.0s |
| Spline slot milling(precision)(¢2.0) | ![]() T6 Alloy end mill |
2200 | 0.1 | ≈17.0s | ≈4.0s |
| U slot milling (thick) (¢3.5) | ![]() T7 Alloy end mill |
2000 | 0.15 | ≈50.0s | ≈5.0s |
| U groove milling (precision)(¢4.0) | ![]() T8 Alloy end mill |
2000 | 0.1 | ≈12.5s | ≈5.0s |
| Milling a 5mm stepping hole based on 4mm with deep size 3mm, | ![]() T8 Alloy end mill |
2000 | 0.15 | ≈8.0s | ≈2.0s |
| End face, chamfer Outside diameter (precision) | ![]() T9 Cylindrical cutter |
2500 | 0.1 | ≈9.5s | ≈2.0s |
| Spline slot chamfer | ![]() T10 chamfer drill |
1800 | 0.2 | ≈16.0s | ≈3.0s |
| U slot chamfer | ![]() T10 chamfer drill |
1800 | 0.2 | ≈25.0s | ≈5.5s |
| Hole boring (precision) | ![]() T11Hole boring cutter |
1600 | 0.08 | ≈10.5s | ≈1.5s |
| Cutting thread | ![]() T12 Thread cutter |
800 | According to screw pitch | ≈11.5s | ≈1.5s |
| cut off | ![]() T13 slotting cutter |
1000 | 0.1 | ≈4.0s | ≈1.5s |
| OP10 processing time(S) | ≈264.0s | ||||
| Feed time(S) | ≈4.0s | ||||
| Joint time(S)+blow air time(S) | ≈5.0s | ||||
| OP10 total time(S) | ≈271.0s | ||||
| Note: Since there is no actual sample processing, the time simulated according to the system may fluctuate up or down by 15% from the actual processing time. | |||||
2. OP20 Processing Clamping Schematic
① Clamping method
② Red area is the machining area.
| Process OP20 | Cutter(T) | Processing speed(r/min) | Processing feed(mm/r) | Processing Time(S) | Quick moving knife(S) |
| End face, chamfer Outside diameter | T1 Cylindrical cutter | 1600/1800 | 0.15/0.09 | ≈5.5s | ≈1.5s |
| Boring (thick) | T2 Hole boring cutter | 1200 | 0.12 | ≈10.5s | ≈1.5s |
| Boring (precision) | T3 Hole boring cutter | 1400 | 0.07 | ≈7.5s | ≈1.5s |
| OP20 processing time(S) | ≈28.0s | ||||
| Discharge time(S)+blow air time(S) | ≈4.0s | ||||
| OP20 total time(S) | ≈32.0s | ||||
| Note: Since there is no actual sample processing, the time simulated according to the system may fluctuate up or down by 15% from the actual processing time. | |||||
| Total processing time (per set ) | ||
| OP10 total time | OP20 total time | total time |
| 271.0s | 32.0s | 303.0s |
| Capacity calculation (per set) | ||
| 16 hour system (2 shifts) beats | 190pcs | |
| 26 day system (per shift) beats | 4942pcs | |
| 12 month schedule (per shift) | 59310pcs | |
| Note: Since there is no actual sample processing, the time simulated according to the system may fluctuate up or down by 15% from the actual processing time. | ||
● Types of equipment to be purchased in the solution: MDY0850-S
(1)Lathe:High precise slant bed CNC turning-milling lathe with double spindle and single power turret MDY0850-S
(2)Feeding mode:Oil film bar feeder+ parts catcher + conveyor belt
● Diagram:
(1)High precise slant bed CNC turning-milling lathe with double spindle and single power turret MDY0850-S machine diagram:
(2) High precise slant bed CNC turning-milling lathe with double spindle and single power turret MDY0850-S machine diagram:
(3) Optical machine diagram
Synchronised electric spindles1:
1: High rotational speed
2: Fast acceleration and deceleration, high efficiency
3: constant torque, high torque, strong rigidity
4: Small vibration, weak sound, high finish
5: accurate positioning, strong turning and milling performance (high configuration)
- 1. BMT55-12 stations power turret
- 2. X axis(box guideway optional)
- 3. Oil cooler
- 4. 8’’ Hydraulic chuck
- 5. Y axis(box guideway optional)
- 6. Hydraulic pressure station
- 7. Integral casting of bed and box(large strengthening of turning rigidity)
- 8. 6’’ Hydraulic chuck
- 9. Sub-spindle(electric spindle)
(4) Feed bar diagram:
(5) Connection diagram:
● Parameters, configuration:
1.MDY0850-S Main technical parameters of machine tools:
| Processing range | Max.swing diameter over bed | mm | 600 |
| Max.turning diameter | mm | 360 | |
| Max.turning length | mm | 500 | |
| Travel and feed Speed/torque | X axis travel(Max.) | mm | 246 |
| Z axis travel(Max.) | mm | 560 | |
| Y axis travel(Max.) | mm | ±55 | |
| Z2axis travel (Sub-spindle.) | mm | 660 | |
| X/Z/R axis Fast mobility | m/min | 15/15/15 | |
| X-axis motor torque | NM | 15 | |
| Z-axis motor torque | NM | 15 | |
| Z2-axis motor torque | NM | 15 | |
| Spindle | Spindle nose | A2-6 | |
| Motor spindle power | Kw | 15 | |
| Spindle output maximum torque | NM | 270 | |
| Spindle maximum speed | Rpm | 4000 | |
| Spindle bore | mm | Φ50 | |
| Chuck | 8 inch hollow | ||
| Sub-spindle | Spindle nose | A2-5 | |
| Rated power of motor | Kw | 11.7 | |
| Spindle output maximum torque | NM | 112 | |
| Maximum spindle speed | Rpm | 5000 | |
| Spindle bore | mm | Φ45 | |
| Chuck | 6 inch hollow | ||
| Processing precision | X/Z/Z2轴重复精度 | mm | 0.005/0.005/0.003 |
| X/Z/Z2轴定位精度 | mm | 0.01/0.01/0.005 | |
| Turret specification | Type | Power turret BMT55 | |
| Toolholder No. | 12 | ||
| Tool shank size | mm | □25*25 | |
| Boring specifications | mm | Φ40 | |
| Machine Dimension | L×W×H | mm | ≈2600*2280*2180 |
| Machine weight | Kg | ≈5800 |
2.MDY0850 lathe main component configuration list:
| Number | Name | Brand | From | Quantity |
| 1 | CNC system | Syntec 22TB | Taiwan | 1 |
| 2 | Servo motor/drive | Syntec all-in-one SMH series | Taiwan | 2 |
| 3 | Spindle motor | 15KW synchronous permanent magnet electric spindle | Italy | 1 |
| 4 | Sub-spindle motor | 11.7kw synchronous permanent magnet electric spindle | 1 | |
| 4 | Ball screws | PMI-X/Y(3210)Z: (4012) | Taiwan | 2 |
| 5 | linear guideway | PMI35 roller guideway | Taiwan | 4 |
| 6 | Spindle Bearings | NTN P4 | Japan | 5 |
| 7 | Spindle structure | Independent spindle with front three bearings and two after | GONGTIE R&D | 1 |
| 8 | Screw support mode | Pre-stretched double braces | GONGTIE R&D | 1 |
| 9 | Hollow hydraulic rotary cylinder | Jia jian 852 | China | 1 |
| Sub-spindle Hollow hydraulic rotary cylinder | Jia jian 646 | 1 | ||
| 10 | Oil cooler | Xin fu | China | 1 |
| 11 | Hydraulic system | Seven ocean | Taiwan | 1 |
| 12 | Electric cabinet with heat exchanger | Xin fu No.5 | China | 1 |
| 13 | Low electrics | Schneider | France | 1 |
| 14 | Spindle fixture | Precision 8 “hydraulic chuck with three jaw | Taiwan | 1 |
| Sub-spindle fixture | Precision 6 “hydraulic chuck with three jaw | 1 | ||
| 15 | Turret | BMT55-12 stations power turret | GONGTIER&D | 1 |
| 16 | Water pump | Standard (15M water lifting pump) | China | 1 |
| 2.Optional items | ||||
| 1 | Chip conveyor | backside | China | 1 |
| 2 | Live tool tower | 0° | China | 7 |
| 3 | High pressure water pump | 30kg | China | 1 |
| 4 | Oil film bar feeder | 326 | Taiwan | 1 |
| 5 | Parts catcher | Swinging arm type | China | 1 |
| 6 | Conveyor belt | Belt Type | China | 1 |
| 7 | Receiving box | Customization | China | 1 |
After-Sales Service
- After the equipment is installed in place, debug it in time.
- Reply within 12 hours according to the customer's telephone and email questions.
- During the warranty period (one year), the maintenance caused by non-human shall be borne by our company; After insurance, spare parts and repair are provided with a fee charged.
Contact Gongtie To Get Your Competitive Advantage
- Get A Quote
- Request For Catalog
- Ask For Machine Details
- Get Worry-free Solution
Contact Gongtie To Get Your Competitive Advantage
- Get A Quote
- Request For Catalog
- Ask For Machine Details
- Get Worry-free Solution
T1 Cylindrical cutter












