X4540-H3 Two in One
A professional CNC lathe manufacturer is always prepared oneself well with solutions for clients !
With permission from clients’, we are sharing you our full experience in bringing productivity processing to our clients .
Please feel free to send your parts drawings and requirements, our team can make processing and automation schemes for you.
Share:
●Processed product:Roller(The name is specified)
●Product material:40Cr(The name is specified)
●Work tool and fixture:
OP10 adopts precision 6-inch hydraulic three-jaw chuck (external clamp)
OP20 adopts precision 6-inch hydraulic three-jaw chuck (internal brace)
●The technical remark:
①Program set tool life management (automatic alarm can reduce the amount of scrap and excessive damage of tool after the customer has booked the processing quantity).
②Additionally equipped with air blowing and water coolant on the toolholder board and robot hand claw air blowing
●Machining accuracy: completely follow up the customer’s drawing
1.OP10 clamping work piece draft
①Internal and external clamping hydraulic clamping mode
②Red area is the machining area
| Process OP10 | Tools(T) | Process speed(r/min) | Traverse(mm/r) | Cycle time(S) | Changing over time(S) |
OD turning, face turning, chamfering | T1OD knife | 1800 | 0.1 | ≈6.5s | ≈1.0s |
| Hole boring | T2 Hole boring cutter | 1800 | 0.07 | ≈18.0s | ≈1.0s |
| OP10 processing time | ≈26.50s | ||||
| Automatic loading and unloading time | ≈10.0s | ||||
| Blowing time (cleaning fixture) | ≈2.0s | ||||
| OP10 total time | ≈36.5s | ||||
| Remarks: due to no sampling, theoretically the processing time will have around 15% deviation. | |||||
1.OP20 clamping work piece draft
①Internal and external clamping hydraulic clamping mode
②Red area is the machining area
| Process OP10 | Tools(T) | Process speed(r/min) | Traverse (mm/r) | Cycle time(S) | Changing over time(S) |
OD turning, face turning, chamfering (thick) | T1OD knife | 1800 | 0.12 | ≈13.5s | ≈1.0s |
OD turning, face turning, chamfering(precision) | T2 OD knife | 2200 | 0.09 | ≈16.5s | ≈1.0s |
| Hole boring | T3 Hole boring cutter | 1800 | 0.07 | ≈2.0s | ≈1.0s |
| OP20 processing time | ≈35.0s | ||||
| Robot hand loading and unloading stock tray time | ≈10.0s | ||||
| Blowing time (cleaning fixture) | ≈2.0s | ||||
| OP20 total time | ≈47.0s | ||||
| Daily production capacity (24 hours) : 1838 units/group | |||||
| Remarks: due to no sampling, theoretically the processing time will have around 15% deviation. | |||||
●Purchased type of equipment:X4540-H3 combined with two machines
(1)Lathe:Precision linear guide-way CNC lathe with slant bed electric spindle lathe X4540
(2)Feed system:Servo truss robot hand+chip conveyor+On-line stainless steel chip conveyor +unloading belt
● Diagram:
(1)Automatic precision linear guide-way CNC lathe with slant bed electric spindle lathe X4540-H3 overall diagram of two connections:
- 1. OP20 lathe
- 2. OP10 lathe
- 3. Rotary head device
- 4. Unloading belt
- 5. On-line transfer system
- 6. Loading system rotary stocking with 12 stations
(2)Machine feeding diagram:
- 1. Oil coolant system
- 2. Hydraulic rotary cylinder
- 3. Synchronous motor spindle ①High speed, high efficiency ②Fast for ACC/DEC, high efficiency ③Big torque force,high rigidity ④Low vibration,better roughness ⑤Positioning accuracy, turning & milling
- 4. ①Precision spring chuck ②Precision hydraulic chuck
- 5. Robot hand claw (in and out)
- 6. Tools
- 7. Precision gear wheel/rack(slant gear)
- 8. Linear guide
- 9. Hydraulic pressure station
- 10. Bed & head all integrated die-casting to strongly enhance the rigidity
(3)Robot hand claw diagram:
(OP10 Robot hand diagram)
- 1. Raw parts
- 2. Loading spring
- 3. Rotating cylinder
- 4. Customized claw
- 5. Loading cylinder
- 6. Unloading cylinder
- 7. Customized claw
- 8. Semi-finished
(OP20 Robot hand diagram)
- 1. Semi-finished
- 2. Loading spring
- 3. Rotating cylinder
- 4. Customized claw
- 5. Loading cylinder
- 6. Unloading cylinder
- 7. Specified claw
- 8. Finished
(3)Rotating head device diagram:
(4)Rotary stocking with 12 station diagram:
- 1. Detection sensor
- 2. Positioning lever
- 3. Top lever
- 4. Adjust the large and small plates
- 5. Stock tray
- 6. Detection sensor
- 7. Loading system rotary stocking with 12 station
(5)Schematic diagram of the on-line conveyor belt:
(6)Unloading belt diagram:
(7) Schematic diagram of online layout
●Technical specification、configuration list:
1.X4540 Main technical parameters of machine tools:
| Main parameter | Unit | Parameter value |
| Max. swing diameter (over bed) | mm | 600 |
| Max. Turning diameter | mm | 320 |
| Max. Turning length | mm | 400 |
| Spindle to toolholder plate center height | mm | 88 |
| Spindle center to ground height | mm | ≈1120 |
| X axis travel (Max.) | mm | 420 |
| Z axis travel (Max.) | mm | 435 |
| X axial motor power/torque | Kw/N | 1.7/8.34 |
| Z axial motor power/torque | Kw/N | 1.7/8.34 |
| Spindle nose size | N/A | A2-5 |
| Hydraulic chuck specifications | collet | 45 |
| Spindle bore diameter | mm | 56 |
| Max. bar through hole diameter (inside/outside) | mm | 45/35 |
| Spindle power (motor spindle) | Kw | 11.7 |
| Spindle rated speed/Max.speed | r/min | 2000/5000 |
| Spindle rated torque/Max.torque | N | 56/112 |
| Number of tools. | pc | 5 |
| Tool shank size | mm | 20 |
| Boring toolholder ID | mm | ¢25 |
| X/Z axis repeating positioning accuracy | mm | 0.005 |
| Water coolant capacity | L | ≈84 |
| Hydraulic oil lubrication capacity | L | 40 |
| Machine full load power | KW | ≈18 |
| Dimension (LxWxH) | mm | 2025*1650*2000 |
| Total machine weight | Kg | ≈2900 |
2.X4540 Main machine component list:
| No. | Item | COMPONENT BRAND & SPEC. | ORIGINAL COUNTERY | Quantity |
| 1 | CNC machine system | Syntec 22TA | Taiwan China | 1 |
| 2 | Servo motor/drive | Syntec SMH in bus | Taiwan China | 2 |
| 3 | Spindle motor | Built-in direct drive electric spindle | Italy | 1 |
| 4 | Ball screw/linear guide | PMI | Taiwan China | 2,4 |
| 5 | Spindle bearing | NTN -P4 | Japan | 5 |
| 6 | Spindle structure | Independent spindle with front three bearings and two after | GONGTIE R&D | 1 |
| 7 | Ball screw supporting bearing | Double supporting with pre-stretching structure | GONGTIE R&D | 1 |
| 8 | Hollow hydraulic rotary cylinder | 646 Jiajian | China | 1 |
| 9 | Hydraulic system | Seven ocean SHF series | Taiwan China | 1 |
| 10 | Electric cabinet with heat exchanger | No. 5 | China | 1 |
| 11 | Low voltage electrics | Schneider | France | 1 |
| 12 | Tools type | 20 square (25 square) row tool holder | GONGTIE R&D | 5 |
| 13 | Water pump | 15 Meters CTS | China | 1 |
| 14 | Fixture | Precision type 45 spring chuck | China | 1 |
| 2、ADD FACILITY: | ||||
| 1 | Chip conveyor | Backside | China | 1 |
| 2 | Fixture | Precision 6 hydraulic three jaw chuck | Taiwan | 1 |
| 3 | High pressure water pump | 45 meters CTS | China | 1 |
3.Automation device:Rotary stock servo robot hand
| No. | Kit | Brand&original country | Quantity |
| Mechanical core component | |||
| 1 | Beam kit | GONGTIE | 1set |
| 2 | Beam linear guide-way | Taiwan PMI | 1set |
| 3 | Gas claw | Japan SMC | 1set |
| 4 | Rotary cylinder | Japan SMC | 1set |
| 5 | Cylinder | Japan SMC | 1set |
| 6 | Sensor | Japan SMC | 1set |
| 7 | Gear wheel/rack(slant gear) | Germany Henryan | 1set |
| 8 | Work-stocker system(in tray/pallet) (12-station ) | GONGTIE | 1set |
| 9 | Loading and unloading device (robot hand claws) | GONGTIE | 1set |
| 10 | On-line stainless steel conveyor chain | GONGTIE | 1set |
| 11 | Rotating head device | GONGTIE | 1set |
| 12 | Unloading belt | GONGTIE | 1set |
| Electrical system core component | |||
| 1 | Electric component | FRANCH SCHNEIDER | 1set |
| 2 | Servo motors/systems | SYNTEC ALL IN ONE | 1set |
| 3 | CNC system | STNTEC ALL IN ONE | 1set |
| 4 | Reduction gear | TAIWAN | 1set |
| 5 | Man-machine interface | SYNTEC ALL IN ONE | 1set |
After-Sales Service
- After the equipment is installed in place, debug it in time.
- Reply within 12 hours according to the customer's telephone and email questions.
- During the warranty period (one year), the maintenance caused by non-human shall be borne by our company; After insurance, spare parts and repair are provided with a fee charged.
Contact Gongtie To Get Your Competitive Advantage
- Get A Quote
- Request For Catalog
- Ask For Machine Details
- Get Worry-free Solution

T2 Hole boring cutter