X4640 CNC machining all-in-one automation solution

This CNC  automation solution includes shaft parts loading & conveyor belt unloading, turning device, high-pressure internal cooling water outlet, etc.

A professional CNC lathe manufacturer is always prepared oneself well with solutions for clients !

With permission from clients’, we are sharing you our full experience in bringing productivity processing to our clients .
Please feel free to send your parts drawings and requirements ,our team can make processing and automation schemes for you.

Share:

X4640 Automation

Product diagram

● Processed products: Fishing gear parts

● Product material:7 series cast aluminum

● Product No.:cbt59

● Fixture: OP10 adopts customized eccentric chuck

Programmable hydraulic control, requiring the hydraulic station to double in double out, 6 “chuck rotation so that the hole center in the main Axis center

1
2
3

● Technical remark:
① Program set tool life management (after the customer predetermined the number of processing, automatic alarm, reduce the product scrap volume and excessive tool damage)

● Customer drawings: no cbt59 plan view, cbt59 3D view

● Cycle time table:

CNC precision maching parts
T1
T1
T2
T3
T4
T5

OP10 Gripper processing diagram:

ProcessCutterCutter No.SpeedFeedingProcessing timeToggle
Milling 4 faces  rough

power head φ

25R1.8 face milling cutter

T120000.15343
Milling 4 faces  precision

Power head φ

25R1.8 face milling cutter

T125000.15132
Width of milling groove 37

Power head φ25 face

Milling cutter

T220000.15242
Width of milling groove 37

Power head φ25 face

Milling cutter

T225000.15191
holeφ14φ17  roughφ12 Milling cutterT316000.1103
holeφ14φ17 precisionInside diameter turning toolT420000.183
Internal slotInner diameter slot toolT515000.175
Processing time134s
Arm robot loading and unloading time8s
Blowing time (cleaning fixture)≈2.0s
OP10 time≈144s

Note: Since there is no actual sample processing, the system simulation time may fluctuate 10% with the actual processing time.

● Types of equipment purchased in the scheme:

(1) Lathe:Precision wire rail inclined bed row tool electric spindle latheX4640-C1

(2) Feeding method: automatic code tray truss machine

● Schematic diagram of machine tool:

  1. Precision wire rail inclined bed row tool electric spindle lathe X4640-C1 Overall diagram:

2. Optical machine diagram:

1
2
3
4
5
6
7
8

3. Truss integrated C diagram

truss
Slant bed Truss integrated
Tray stocking
Arm robot
Chip cleaner

4. Arm robot diagram:

1
2
3
4
5
6
7
8

OP10 Arm robot diagram

1
2
3
4
5
6
7
8

OP20 Arm robot diagram

5. Tray stocking schematic drawing(double layer 60 pcs):

Lower double tray
upper double tray
Finished

remark:Manipulator claw plate and layer tray are customized according to customers’ products

Process Tool Tool number Speed Feed Processing time Switch
Cap T8 3
Face thick turning tool T1 2000 0.2 2 0.5
Coarse outside diameter turning tool T1 2000 0.2 2 0.5
End finishing tool T2 2200 0.12 2 0.5
Outside diameter finishing tool T2 2200 0.12 2 0.5

2.Countershaft clamping processing diagram

Note: Since there is no actual sample processing, the system simulation time may fluctuate 10% with the actual processing time.

● Parameters, configuration:

(1)X4640-C1 Main technical parameters of machine tools

Technical Parameter Unit Parameter
Max.swing diameter over bed mm Φ600
Max.turning diameter mm 320
Max.turning length mm 400
X axis travel(Max.) mm 460
Z axis travel(Max.) mm 435
Height of spindle center to ground mm ≈1080
Spindle structure First three and then two independent spindle units Synchronous permanent magnet electric spindle
Spindle nose N/A A2-5
Hydraulic chuck inch 6
Hydraulic cylinder 646
Spindle bore mm 56
Max. diameter of rod through hole in drawing tube mm Cylinder through hole 46
Motor spindle Kw 11.7
Spindle rated speed/Max.speed r/min 0-5000(2000)
Spindle rated speed/Max.torque N 56/112
Toolholder No. pcs 5
Tool shank size mm 20
Boring toolholder No. mm Φ25
Minimum movement mm 0.001
X/Z axis rapid traverse (G0) m/min 20
X/Z axis repeatability mm 0.005
Machine full load power KW ≈18
Tank capacity L 42
Hydraulic tank capacity L 20
Dimension(L*W*H) mm 2025*1650*2000
Total machine weight Kg ≈2860
2.Add optional items
Custom moving eccentric chuck inch 6
Syntec Independent Live top 1 KW 1.3
Syntec Independent Live top 2 KW 1.3

(2)X4640-C1 Machine tool main component configuration list (standard configuration):

NumberNameBrandFromQuantity
1CNC systemSyntec 22TATaiwan1
2Servo motor/driveSyntec AM8 Taiwan2
3Spindle motorPermanent magnet synchronous motorized 11.7KWItaly1
4Guide way/ ballscrews3210/30 Roller grade PTaiwan2,4
5Spindle BearingsNTN P4Japan5
6Spindle structureIndependent spindle with front three bearings and two afterGONGTIE R&D1
7Screw support modePre-stretched double bracesGONGTIE R&D1
8Hollow hydraulic rotary cylinder646Taiwan components1
9Hydraulic systemSeven OceanShanghai1
10Electric cabinet with heat exchangerNo.5 Taiwan components1
11Low electricsschneiderFrance1
12Water pumpStandard (15M water lifting pump)China1
2.Add optional items

(3) Automation solution:Palletizing servo arm robot

Mechanical core component

No. Part name Brand From Quantity
1 Whole machine truss GONGTIE China 1 Set
2 Tray stocking with servo double layer GONGTIE China 1 Set
3 Loading and Unloading assembly (mechanical claw) GONGTIE China 1 Set

Electrical system core components

No.Part nameBrandFromQuantity
1Electrical componentSchneiderFrance1 Set
2Servo motor/driveSyntec ALL IN ONETaiwan1 Set
3Control systemSyntec ALL IN ONETaiwan1 Set
4Man-machine interfaceSyntecTaiwan1 Set

● After-sales service:

1. After the equipment is installed in place, debug it in time.
2. According to the customer telephone fax reflected the question, within 1 hour to reply.
3. On-site service and maintenance, 24 hours in place in the city, 48 hours in the province (including Jiangsu, Zhejiang and Shanghai), other areas
It depends.
4. During the warranty period (one year), the maintenance caused by non-human shall be borne by our company; After insurance, pay to provide matching Parts and maintenance.

● Distribution item

Distribution itemQuantity
Instruction manual1set
Machine tool warranty card1set
Electrical specification1set
Machine tool inspection book1set
Numerical control system specification1set
Common tool1set

● Delivery time: 50 working days after contract signing

● This plan is valid for 7 days

After-Sales Service

Contact Gongtie To Get Your Competitive Advantage

Contact Gongtie To Get Your Competitive Advantage

Scroll to Top

get in touch